Barsebäck NPP

From Nuclear Heritage
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Draft

Source for pictures

http://commons.wikimedia.org/wiki/Category:Barseb%C3%A4ck_nuclear_power_plant

Data

Location:

  • Operator: Barsebäck Kraft AB (Owned by Ringhals AB, which in turn is owned by Vattenfall (70,44 %) and E.ON Kärnkraft Sverige AB (29,56 %). The physical facility is owned 100% by E.ON Kärnkraft AB[1]
  • Capacity: Barsebäck 1 & 2: 600 MW netto. Total: 1200 MW netto.
  • (How much radiation it sets free?)
  • Dates of construction & operation: Sydkraft decided on buying land in Barsebäck for a NPP on December 10 1965.[2]
    • Barsebäck 1: commissioned 1969, startup January 1975, connected to grid May 15 1975, shut down November 30 1999[3]
    • Barsebäck 2: commissioned 1970, startup 1977(?), connected to grid March 21 1977, shut down May 31 2005[4]
    • The reactors are awaiting deconstruction, which will be started when the expansion of the SFR Repository at Forsmark is ready, which is estimated to be in 2020.[5] [6]
  • How much a power plant produces
  • type of reactor: BWR
  • about exploration sites: Sizes
  • how much waste a reactor produces per year
  • information about the fuel
  • Employees: ca 100[7]
  • number of people living around the facility:
  • number of accidents:

Summary

short text (1'500 characters max.)

Resistance

contact details of critical groups working against this facility

  • group name, phone, email, website, postal address

Links

links to operator and critical websites

Operator: http://www.barsebackkraft.se/

References