Difference between revisions of "Castor Resistance in Germany 2018"
From Nuclear Heritage
Jump to navigationJump to search (+cat + updated) |
(formattings) |
||
Line 1: | Line 1: | ||
− | * the next [[Castor]] transports to [[Gorleben]] (D) are supposed to take place in 2017<ref>BI Lüchow-Dannenberg [[PR:Gezerre um Castoren geht in die nächste Runde|media release]] as of January 2, 2015<br/>formerly 2015 was expected, see: http://www.bi-luechow-dannenberg.de/?p=11122 as at January 23, 2014</ref>: | + | * '''the next [[Castor]] transports to [[Gorleben]] (D) are supposed to take place in 2017'''<ref>BI Lüchow-Dannenberg [[PR:Gezerre um Castoren geht in die nächste Runde|media release]] as of January 2, 2015<br/>formerly 2015 was expected, see: http://www.bi-luechow-dannenberg.de/?p=11122 as at January 23, 2014</ref>: |
** high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks<ref>http://www.ndr.de/regional/niedersachsen/heide/castortransport/castor1749.html as at December 8, 2011</ref> in 3 shipments (of 7 containers each)<ref>press release: Castoren sollen ab 2015 wieder rollen, BI Lüchow-Dannenberg, email as of March 14, 2013</ref> or 4 shipments<ref name="neumann" /><br/>''(earlier information: 2014<ref name="atomforum">Accoring to a booklet of ''Deutsches Atomforum'', the lobby organization of the German nuclear industry: "Die Rücknahme von Wiederaufarbeitungsabfällen aus Frankreich und Großbritannien. Transport und Zwischenlagerung von Glaskokillen" as at January 19, 2012</ref>, 2015<ref>source: presentation of ''AG Schacht Konrad'' at Nuclear Waste Conference in Kassel (D) on February 2, 2013</ref>; or 2016<ref>http://www.bi-luechow-dannenberg.de/?p=11095 as at January 23, 2014</ref>-2017<ref name="neumann" />)'' | ** high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks<ref>http://www.ndr.de/regional/niedersachsen/heide/castortransport/castor1749.html as at December 8, 2011</ref> in 3 shipments (of 7 containers each)<ref>press release: Castoren sollen ab 2015 wieder rollen, BI Lüchow-Dannenberg, email as of March 14, 2013</ref> or 4 shipments<ref name="neumann" /><br/>''(earlier information: 2014<ref name="atomforum">Accoring to a booklet of ''Deutsches Atomforum'', the lobby organization of the German nuclear industry: "Die Rücknahme von Wiederaufarbeitungsabfällen aus Frankreich und Großbritannien. Transport und Zwischenlagerung von Glaskokillen" as at January 19, 2012</ref>, 2015<ref>source: presentation of ''AG Schacht Konrad'' at Nuclear Waste Conference in Kassel (D) on February 2, 2013</ref>; or 2016<ref>http://www.bi-luechow-dannenberg.de/?p=11095 as at January 23, 2014</ref>-2017<ref name="neumann" />)'' | ||
** intermediate level radioactive waste (MAW) in 5 (formerly announced: 11) ''CASTOR HAW28M'' casks in 2 shipments from the plutonium factory (so-called "reprocessing unit") in [[La Hague]] (F) expected in 2017<br/>''(earlier information: 2014<ref name="atomforum" />, but by 2015<ref name="neumann">lecture by Wolfgang Neumann at ''Atommüllkonferenz'' in Hannover, June 23, 2012</ref>)'' | ** intermediate level radioactive waste (MAW) in 5 (formerly announced: 11) ''CASTOR HAW28M'' casks in 2 shipments from the plutonium factory (so-called "reprocessing unit") in [[La Hague]] (F) expected in 2017<br/>''(earlier information: 2014<ref name="atomforum" />, but by 2015<ref name="neumann">lecture by Wolfgang Neumann at ''Atommüllkonferenz'' in Hannover, June 23, 2012</ref>)'' |
Revision as of 14:07, 2 January 2015
- the next Castor transports to Gorleben (D) are supposed to take place in 2017[1]:
- high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks[2] in 3 shipments (of 7 containers each)[3] or 4 shipments[4]
(earlier information: 2014[5], 2015[6]; or 2016[7]-2017[4]) - intermediate level radioactive waste (MAW) in 5 (formerly announced: 11) CASTOR HAW28M casks in 2 shipments from the plutonium factory (so-called "reprocessing unit") in La Hague (F) expected in 2017
(earlier information: 2014[5], but by 2015[4])
- high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks[2] in 3 shipments (of 7 containers each)[3] or 4 shipments[4]
- see also: Castor resistance 2011, 2010 and 2008 and a short history of the Castor transports to Gorleben on this website
Action
"BI Umweltschutz Lüchow-Dannenberg started a collection of signatures to stop the possible 2015 MAW Castor transports before they would be started. Individuals and organizations can sign on their website.
- ↑ BI Lüchow-Dannenberg media release as of January 2, 2015
formerly 2015 was expected, see: http://www.bi-luechow-dannenberg.de/?p=11122 as at January 23, 2014 - ↑ http://www.ndr.de/regional/niedersachsen/heide/castortransport/castor1749.html as at December 8, 2011
- ↑ press release: Castoren sollen ab 2015 wieder rollen, BI Lüchow-Dannenberg, email as of March 14, 2013
- ↑ 4.0 4.1 4.2 lecture by Wolfgang Neumann at Atommüllkonferenz in Hannover, June 23, 2012
- ↑ 5.0 5.1 Accoring to a booklet of Deutsches Atomforum, the lobby organization of the German nuclear industry: "Die Rücknahme von Wiederaufarbeitungsabfällen aus Frankreich und Großbritannien. Transport und Zwischenlagerung von Glaskokillen" as at January 19, 2012
- ↑ source: presentation of AG Schacht Konrad at Nuclear Waste Conference in Kassel (D) on February 2, 2013
- ↑ http://www.bi-luechow-dannenberg.de/?p=11095 as at January 23, 2014