Castor Resistance in Germany 2018
From Nuclear Heritage
Jump to navigationJump to searchplace of departure -> destination | number of Castor casks | possible year of transport | comment |
---|---|---|---|
Obrigheim -> Neckarwestheim[2] | 15 Castor casks | 2017 | transport by ship on Neckar river; Obrigheim NPP was closed on May 11, 2005[3] 1st transport started on June 26th, 2017[4] 2nd transport started on September 4th, 2017[5] |
La Hague -> Phillipsburg | 5 Castor casks | from 2018 | |
Jülich -> Ahaus | 152 Castor casks | from 2018[6] | |
Garching -> Ahaus | 5 Castor casks | from 2018 | |
Sellafield -> Brokdorf | 7 Castor casks | 2018, 2019 or 2020 | |
Sellafield -> Biblis | 7 Castor casks | 2018, 2019 or 2020 | |
Sellafield -> Ohu | 7 Castor casks | 2018, 2019 or 2020 |
- the next Castor transports to a temporary nuclear repository in Germany (formerly destination was Gorleben[7]) are supposed to take place in 2017[8]:
- high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks[9] in 3 shipments (of 7 containers each)[10] or 4 shipments[11]
(earlier information: 2014[12], 2015[13]; or 2016[14]-2017[11]) - intermediate level radioactive waste (MAW) in 5 (formerly announced: 11) CASTOR HAW28M casks in 2 shipments from the plutonium factory (so-called "reprocessing unit") in La Hague (F) expected in 2017
(earlier information: 2014[12], but by 2015[11])
- high level radioactive waste from the plutonium factory (so-called "reprocessing unit") in Sellafield (UK) in 21 Castor casks[9] in 3 shipments (of 7 containers each)[10] or 4 shipments[11]
- see also: Castor resistance 2011, 2010 and 2008 and a short history of the Castor transports to Gorleben on this website
Past activities
"BI Umweltschutz Lüchow-Dannenberg started a collection of signatures to stop the possible 2015 MAW Castor transports before they would be started. Individuals and organizations can sign on their website.
- ↑ http://anti-atom-aktuell.de/castor/3.html as of October 13, 2016
- ↑ https://neckarwestheim.antiatom.net/blog/1299-kein-castor-transport-von-obrigheim-nach-neckarwestheim as of November 1, 2016
- ↑ https://de.wikipedia.org/w/index.php?title=Kernkraftwerk_Obrigheim&oldid=158341416 as of October 13, 2016
- ↑ https://www.neckar-castorfrei.de/informiert-sein/newsletter/178-castor-voralarm as of June 26, 2017
- ↑ https://www.neckar-castorfrei.de/informiert-sein/news-berichte/250-castor-alarm-im-september as at September 4, 2017
- ↑ .ausgestrahlt informiert: Atommüll auf dem Neckar. Fragen und Antworten zu den geplanten Castor-Transporten vom AKW Obrigheim zum AKW Neckarwestheim; January 2017
- ↑ information by BI Lüchow-Dannenberg via e-mail as of July 8th, 2016
- ↑ BI Lüchow-Dannenberg media release as of January 2, 2015
formerly 2015 was expected, see: http://www.bi-luechow-dannenberg.de/?p=11122 as at January 23, 2014 - ↑ http://www.ndr.de/regional/niedersachsen/heide/castortransport/castor1749.html as at December 8, 2011
- ↑ press release: Castoren sollen ab 2015 wieder rollen, BI Lüchow-Dannenberg, email as of March 14, 2013
- ↑ 11.0 11.1 11.2 lecture by Wolfgang Neumann at Atommüllkonferenz in Hannover, June 23, 2012
- ↑ 12.0 12.1 Accoring to a booklet of Deutsches Atomforum, the lobby organization of the German nuclear industry: "Die Rücknahme von Wiederaufarbeitungsabfällen aus Frankreich und Großbritannien. Transport und Zwischenlagerung von Glaskokillen" as at January 19, 2012
- ↑ source: presentation of AG Schacht Konrad at Nuclear Waste Conference in Kassel (D) on February 2, 2013
- ↑ http://www.bi-luechow-dannenberg.de/?p=11095 as at January 23, 2014