Difference between revisions of "Castor Transport to Lubmin"

From Nuclear Heritage
Jump to navigationJump to search
(updated)
m
Line 44: Line 44:
 
[[Category: 2010/12/16]]
 
[[Category: 2010/12/16]]
 
[[Category: 2011/01/06]]
 
[[Category: 2011/01/06]]
 +
[[Category: 2011/01/17]]
 
[[Category: 2011/02/15]]
 
[[Category: 2011/02/15]]
 
[[Category: 2011/02/16]]
 
[[Category: 2011/02/16]]
 
[[Category: 2011/02/17]]
 
[[Category: 2011/02/17]]
 
[[Category: 2011/02/18]]
 
[[Category: 2011/02/18]]

Revision as of 21:51, 19 January 2011


Formerly the nuclear waste should have been stored in Lubmin for some 40 years and it was expected to close the repository in 2039. Recently the federal parliament agreed financing the facility until 2080 argueing with the unsolved question of final disposal for the long-term radioactive material. Activists suspect Lubmin to become de facto a final repository for the stored nuclear waste.[2]

Actions


Materials


past events

  • preparation meeting on January 6, 2011 at 6.30 PM at the Klex in Greifswald (D)
  • transport of 4 containers from Cadarache, France probably on December 14-16, 2010
  • start-up demonstration on December 11, 2010 at 1 PM at the railway station in Greifswald (D)
  • preparation meeting on December 3, 2010 at 6 PM in the house of the BI (citizen's initiative) in Lüchow, Rosenstr. 20 (D)