Difference between revisions of "International Anti-nuclear Network Meeting in Döbeln/Preparation"
From Nuclear Heritage
Jump to navigationJump to searchLine 12: | Line 12: | ||
** [http://www.couchsurfing.org/group_read.html?gid=17243&post=12526398 CouchSurfing volunteering group] | ** [http://www.couchsurfing.org/group_read.html?gid=17243&post=12526398 CouchSurfing volunteering group] | ||
** [http://www.couchsurfing.org/activity/view/8YRMH5/international-anti-nuclear-camp-gathering The camp promoted in CouchSurfing as an activity in Döbeln] | ** [http://www.couchsurfing.org/activity/view/8YRMH5/international-anti-nuclear-camp-gathering The camp promoted in CouchSurfing as an activity in Döbeln] | ||
+ | ** [http://www.couchsurfing.org/activity/view/914U7A/help-with-construction-for-anti-nuclear-camp Helping with construction works for the camp as CouchSurfing activity in Döbeln] | ||
** Hospitality Club (Ecology Forum) | ** Hospitality Club (Ecology Forum) | ||
** [http://www.bewelcome.org/forums/s2533?sidTB=x7X8TUoP4Hj3W4GF0kKrhfFRbdb BeWelcome Environmentalists group] | ** [http://www.bewelcome.org/forums/s2533?sidTB=x7X8TUoP4Hj3W4GF0kKrhfFRbdb BeWelcome Environmentalists group] |
Revision as of 13:29, 8 July 2012
Preparation of the Anti-nuclear Summer Camp
Promotion
- email: English | German | Portuguese
- flyer: English | German
- media work
- Hospitality networks:
organizing issues
Financial issues
- YOUTH IN ACTION grant for the gathering - tasks we have to do:
- write final report by January 2013
Practical issues
- flyer to the neighbours to ask for patience in case of disturbance
Participants issues
Programme issues
Preparation meetings
- Skype conference 09.06.2012
- Skype conference 10.06.2012
- preparation meeting Döbeln 9.-10.06.2012
- Skype conference 25.06.2012
- Skype conference 04.07.2012
- Skype conference 11.07.2012