Risö Research Reactor
From Nuclear Heritage
Jump to navigationJump to searchThe printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- DR-1 Reactor in Nucleus IAEA-Database (IAEA Code DK0002)
- start of construction: 01/07/1957[1]
- first criticality: 15/08/1957[1]
- learn more: The department of project management
- DR 1 Final Report
- DR-2 Reactor in Nucleus IAEA-Database (IAEA Code DK0001)
- start of construction: 07/12/1956[2]
- first criticality: 18/12/1958[2]
- DR 2 Final Report
- DR-3 Reactor in Nucleus IAEA-Database (IAEA Code DK0003)
Background information
- Center for Nuclear Technologies
- Danish Decommissioning
- media release: Danish Decommissioning and The Danish Ministry of Health cancel participation in international nuclear waste conference (March 16, 2015)
- media release: Six NGOs invite to an international nuclear waste conference in the Danish parliament building, Christiansborg (March 11, 2015)
- ↑ 1.0 1.1 http://nucleus.iaea.org/RRDB/RR/GeneralInfo.aspx?RId=112 as at September 16, 2012
- ↑ 2.0 2.1 http://nucleus.iaea.org/RRDB/RR/GeneralInfo.aspx?RId=111 as at September 26, 2012
- ↑ 3.0 3.1 3.2 3.3 3.4 http://nucleus.iaea.org/RRDB/RR/HeaderInfo.aspx?RId=113 as at September 26, 2012