Irradiated nuclear fuel of the Salaspils research reactor in Latvia has been delivered to the ''Production Association'' [[Kyshtym Disaster|Mayak]] in Russia. The enterprise’s press service reports the train load of spent nuclear fuel arrived at Mayak on May 15 2008. The delivery was arranged in an agreement between Russia and Latvia regarding repatriation of spent nuclear fuel of the research reactor shutdown in Salaspils.
 
Irradiated nuclear fuel of the Salaspils research reactor in Latvia has been delivered to the ''Production Association'' [[Kyshtym Disaster|Mayak]] in Russia. The enterprise’s press service reports the train load of spent nuclear fuel arrived at Mayak on May 15 2008. The delivery was arranged in an agreement between Russia and Latvia regarding repatriation of spent nuclear fuel of the research reactor shutdown in Salaspils.
 +
 +
 +
=== more sources ===
 +
* [http://nucleus.iaea.org/RRDB/RR/HeaderInfo.aspx?RId=267 IRT Reactor in ''Nucleus'' IAEA information system]
 +
* [http://nucleus.iaea.org/RRDB/RR/HeaderInfo.aspx?RId=268 RKS25 Reactor in ''Nucleus'' IAEA information system]
 +
  
  

Revision as of 23:05, 25 September 2012

Summary

Salaspils Research Reactor (SRR) is located in the Salaspils municipality in Latvia. It was the only civilian research reactor in the Baltics[16]. The plant partook in neutron activation analysis and gamma irradiation for various materials.

The research reactor was originally built according to former USSR design as a pool-type light water-water reactor with 2 MW nominal thermal power. Since 1975, after physical reconstruction of the reactor, the nominal thermal power of the reactor was increased up to 5 MW. In 1995 the Cabinet of Ministers made the decision to start preparations for the decommissioning and in 1998 the second decision was made about permanent shutdown of the reactor.[17]

The estimated amount of radioactive waste the decommissioning of the SRR will generate is 1200 m³.[18]

There was a small radioactive waste storage on the site of the SRR (1975-2005) where some parts dismantled from the reactor core were stored after reconstruction activities in 1975. After characterisation and re-packing all waste was transferred to the radioactive waste repository „Radons“ in Baldone. The spend fuel was sent to Russia in May 2008 within a bilateral governmental agreement.[19]

Links

Technical Information

  • Salaspils Research Reactor (SRR)
  • Location: Salaspils, District of Salaspils, Latvia, 2 km from the centre of Salaspils city, 25 km from Riga, the capital
  • State Property
  • Type of Reactor: Pool Type 5 MWth IRT Reactor
  • In Operation: September 26, 1961- June 19, 1998
  • Status: Closed
  • Population of the Area: 23 312 (data as of 01.01.2012)


Background Information

The reactor was operational from 1969 to July 1998. The plant partook in neutron activation analysis and gamma irradiation for various materials. It was a pool-type reactor. In May 1995, the Latvian government decided to shut down the Research Reactor Salaspils (SRR) and to dispense with nuclear energy in future.

The IRT research reactor in Salaspils site near the capital of Latvia – Riga was put into operation in September 1961. The research reactor was originally built according to a former USSR design as a pool-type light water-water reactor with nominal thermal power of 2 MW. Since 1975, after physical reconstruction of the reactor, the nominal thermal power of the reactor was increased up to 5 MW. On 16 May 1995, the Cabinet of Ministers had made the order to shut down the SRR and requested to start the preparation of a concept for decommissioning.

The relevant technical co-operation project on decommissioning the research reactor was submitted to IAEA for 1997/1998. There were 5 expert missions from IAEA from July 1997 until June 1998. The conclusion was made, that the total decommissioning and dismantling costs would amount to ECU[20] 17-20 millions.

The following budget plan (price base 1998) statements for the decommissioning and dismantling of SRR were made:

  • The annual costs at the beginning of the decommissioning and dismantling project (1999-2000) were comparatively low and amounted to approximately ECU 700,000.00 per year;
  • The costs during the licensing phase are higher and amount to approximately ECU 1,940,000.00 in 2001 and ECU 2,780,000.00 in 2002.
  • The highest annual investments of approximately ECU 5,560,000,00 are required in 2003, when the necessary additional equipment (fuel handling, waste treatment) will be delivered and the modifications at SRR have to be done.
  • Subsequently, the annual costs decrease to approximately ECU 3,056,000.00 in 2004 (main tasks are the delivery of the transport and storage casks and the execution of the fuel reloading).
  • The annual costs during the final dismantling period amounts to approximately ECU 850,000.00 in the years 2005 to 2008 and were covered by Latvian side.

Irradiated nuclear fuel of the Salaspils research reactor in Latvia has been delivered to the Production Association Mayak in Russia. The enterprise’s press service reports the train load of spent nuclear fuel arrived at Mayak on May 15 2008. The delivery was arranged in an agreement between Russia and Latvia regarding repatriation of spent nuclear fuel of the research reactor shutdown in Salaspils.


more sources


additional texts


Media Coverage (in Latvian)


  1. Cite error: Invalid <ref> tag; no text was provided for refs named wikipedia_olkiluoto
  2. 2.0 2.1 http://de.wikipedia.org/w/index.php?title=Kernkraftwerk_Olkiluoto&oldid=103804731 as at June 8, 2012
    http://www.tvo.fi/www/page/ol1andol2/ - December 10, 2010
  3. http://www.stuk.fi/ydinturvallisuus/ydinvoimalaitokset/olkiluoto/en_GB/olkiluoto_tekniset
  4. 4.0 4.1 http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=FI&site=OLKILUOTO&units=&refno=5&link=HOT&sort=&sortlong=Alphabetic - December 10, 2010
  5. 5.0 5.1 http://www.tvo.fi/www/page/2855/ - December 10, 2010
  6. 6.0 6.1 6.2 http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=FI&site=OLKILUOTO&units=&refno=3&link=HOT&sort=&sortlong=Alphabetic - December 10, 2010
  7. 7.0 7.1 7.2 Cite error: Invalid <ref> tag; no text was provided for refs named Olkiluoto-Wikipedia
  8. 8.0 8.1 8.2 http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=FI&site=OLKILUOTO&units=&refno=4&link=HOT&sort=&sortlong=Alphabetic - December 10, 2010
  9. 9.0 9.1 9.2 9.3 9.4 http://www.tem.fi/files/21275/38981_TEM_Nuclear_Energy_in_Finland_LR.pdf
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 http://www.tem.fi/files/18506/YVA_selostusraportti_EN_Secured.pdf - December 11, 2010
  11. 11.0 11.1 http://www.stuk.fi/ydinturvallisuus/ydinjatteet/ydinjate/en_GB/ydinjate/_files/12222632510021180/default/fin_country_profile.pdf - December 11, 2010
  12. 12.0 12.1 Cite error: Invalid <ref> tag; no text was provided for refs named stuk_events
  13. http://www.contratom.de/2.0/index.php?mod=standort&id=194 - December 10, 2010
  14. http://www.contratom.de/2.0/index.php?mod=standort&id=506 - December 10, 2010
  15. http://www.contratom.de/2.0/index.php?mod=artikel&id=30359 - December 11, 2010
  16. http://inventions.lza.lv/proto.php?id=131
  17. http://www.bsrrw.org/wp-content/uploads/2010/07/Salaspils-reaktora-likv-10.1.1.26.802.pdf
  18. http://www.vatesi.lt/fileadmin/documents/Ataskaitos/Latvijos.pdf
  19. Idem