Visaginas NPP
Technical Data | Visaginas NPP | |
General information | ||
Owner: | A common company, representing Hitachi and GE Hitachi Nuclear Energy, and state owned companies Lietuvos Energija (owned by the Republic of Lithuania), Latvenergo (owned by the Republic of Latvia) and Eesti Energia (owned by the Republic of Estonia), yet to be formed | |
Developer: | Lietuvos energija | |
Location: | Visaginas Municipality, Lithuania | |
Territory: | ||
Capacity: | 3,400 MW | |
Type of Waste: | ||
Safety issues | ||
Total Radioactivity: | 5.5×1,014 Bq (data of 2008)[1] | |
Sanitary Protection Zone: | km | |
Population of the area: | ||
Construction data | ||
Construction to start: | 2015 | |
Status: | Planned |
Summary
Visaginas NPP is a regional project intended to provide electricity for Lithuania instead of closed Ignalina NPP. As of July 2013, there are 3 regional partners - Lithuania, Latvia and Estonia involved in the project, in addition to strategic investor GE Hitachi Nuclear Energy. In 2012, Lithuanian citizens voted against building a new NPP in the country. However, the talks about building the plant continue.
The city of Visaginas is situated in the northeast of Lithuania, 150 km from Vilnius and 8 km from the border with Latvia. It was founded in 1975 as Sniečkus for the workers of the Ignalina NPP on the shores of Lake Visaginas. Four villages had been demolished for that workers' town, with the biggest one of them known as Visaginas.[2]
Proposals to construct a new NPP at the old Ignalina NPP site, that had been closed in accordance with Lithuania's accession agreement to the EU[3] at the end of 2009, have been made since 2007[4]. First discussions regarding new reactors started already in the 1990s and were continued in the 2000s[3]. In October 2011, the Lithuanian government informed the European Union about their construction plans[5].
The Visaginas Nuclear Plant Company has been set up by electricity companies of Lithuania, Estonia, Latvia, and Poland on July 30, 2008 to be responsible for the construction of the new NPP. Poland later withdrew from the project. It is supposed to be a 1,300 MW boiling water reactor[5] while earlier a maximum capacity of up to 3,400 MW distributed over two reactors had been announced[3]. On July 14, 2011[5] the GE Hitachi Nuclear Energy has been selected as a strategic investor of the project.[4] The estimated construction costs is 5 billion Euros[3]. However, given interest, inflation and expenses caused by changes in the value of investments it is likely that the costs will be 6.8 billion Euros [6].
On October 14th, 2012, 62,6 percent of Lithuanian citizens, who attended a nation-wide consultative referendum, voted "No" on a statement “I am in favor of constructing a new nuclear power plant in the Republic of Lithuania”. After that, Lithuanian politicians were trying to downplay the results of the referendum, questioning the legal consequences of the referendum. The results of the referendum are legally binding according to the Law on Referendum [7]. Following the referendum, a work group was formed to analyze the project and to propose the most cost-optimal and consumer friendly model of Lithuanian energy supply system.
In 2020 the NPP is supposed to be ready to be connected to the grid[3].
- An international anti-nuclear conference focusing on the new NPP construction plans of Lithuania, Belarus and Kaliningrad (Russia) took place in Vilnius (LT) on December 6-8, 2011
Critics
contact details of critical groups working against this facility
- group name, phone, email, website, postal address
- NGO "Community Atgaja"
- phone: +370 425566, +370 407155
- email: linas AT atgaja.lt[8]
- http://www.atgaja.lt
- NGO "Susivienijimas ŽALI.LT"
- phone: +370 865473926
- email: zali.vilnius AT gmail.com[8]
- http://www.zali.lt
- Lietuvos žaliųjų partija (Lithuanian Green Party)"
- phone: +370 52 131353
- email: administracija AT lzp.lt[8]
- http://www.lzp.lt
- Lietuvos valstiečių ir žaliųjų sąjunga (The Lithuanian Peasant and Green Union)
- phone: +370 52 120821
- email: info AT lvzs.lt[8]
- http://www.lvzs.lt
Media coverage
- Banner Action Tue, Dec 18th: Stop Hitachi's Nuclear Export! Lithuanian National Referendum Says "No" To Nuclear Power German
- Litauen informiert die Europäische Kommission über Neubaupläne German
- Visaginas AES Various materials about the topic Latvian
- Munks un kodolatkritumu uzglabāšanas problēma Visaginā (May 11, 2012)Latvian
- Pavļuts: Latvijai līdzdalība Visaginas AES projektā nav kritiska (May 30, 2012)Latvian
- Točs: Visaginas AES projekts ir pelnījis vismaz diskusiju parlamentā (May 31, 2012)Latvian
- Par Visaginas AES šaubās arī igauņi (June 12, 2012)Latvian
- Piecas tēzes par Visaginas AES (June 12, 2012)Latvian
- "Latvenergo" prognozē Visaginas AES koncesijas līguma parakstīšanas atlikšanu (June 18, 2012)Latvian
- Pavļuts: miljards Visaginas AES projektam atradīsies tikai, ja projekts būs izdevīgs; Latvija spiedienam nepakļausies (June 19, 2012)Latvian
- Tautsaimniecības komisija: Latvijas līdzdalība Visaginas AES projektā jānosaka deklarācijā (June 19, 2012)Latvian
- Visaginas AES strīdīgo jautājumu apspriešana neesot mēneša jautājums (June 19, 2012)Latvian
- Diskusija par Visaginas AES Video (June 20, 2012)Latvian
- Visaginas AES būvniecība sadārdzinās (June 20, 2012)Latvian
- Vai ārzemju atomenerģijas malduguns? (June 20, 2012)Latvian
- Visaginas AES konsultants: Lielbritānijā ir normāli reģistrēt uzņēmumus savu sekretāru adresēs (June 20, 2012)Latvian
- Jūnijā Lietuva neparakstīs vienošanos ar Visaginas AES stratēģisko investoru (June 25, 2012)Latvian
- "Latvenergo" Visaginas AES projekta vērtēšanai izvēlējies piecus konsultantus (June 26, 2012)Latvian
- Visaginas AES projekta virzība atpaliek no termiņiem (June 27, 2012)Latvian
- Turpinās izvērtēt Latvijas dalību Visaginas AES projektā Video (June 29, 2012)Latvian
- Daugavpilī rīko plašu ekoloģisku kampaņu pret Visaginas AES (July 2, 2012)Latvian
- Ķecerīgas pārdomas jaunās atomstacijas paēnā (July 2, 2012)Latvian
- Visaginas AES salīdzina ar mākslīgo «vulkānu» (July 2, 2012)Latvian
- Tarifa atlaižu ap Visaginas AES tomēr nebūs (July 2, 2012)Latvian
- Konsultants plāno vērtēt arī Latvenergo Visaginas AES projektā nepieciešamo jaudu (July 3, 2012)Latvian
- 45% Latvijas ekonomiski aktīvo iedzīvotāju atbalsta Latvijas dalību Visaginas atomelektrostacijas projektā TNS Latvia mājas lapa (July 10, 2012)Latvian
- Aptauja: 45% iedzīvotāju atbalsta Latvijas dalību Visaginas atomelektrostacijas projektā NRA (July 10, 2012)Latvian
- Briselē vides aktīvisti iestājas pret ieceri Baltijas reģionā būvēt atomelektrostacijas (July 11, 2012)Latvian
- Referendums par Visaginas AES nebūs juridiski saistošs (July 16, 2012)Latvian
- Kubiļus: Sabiedrībai par Visaginas AES projektu sniegts maksimālais iespējamais informācijas apjoms (July 19, 2012)Latvian
- Eksperts: Visaginas AES ir šaubīga investīcija (July 27, 2012)Latvian
- Kodolreaktora inženieris: Tikai piedaloties Visaginas AES, varēsim aizstāvēt savas intereses (August 4, 2012)Latvian
- IUB liedz "Latvenergo" slēgt līgumu ar Visaginas AES konsultantu (August 6, 2012)Latvian
- Baltijas Ministru padome vienojas dibināt Visaginas AES projekta kompāniju (September 20, 2012)Latvian
- Latvijas finansiālais ieguldījums Visaginas AES projektā joprojām nav aprēķināts (September 20, 2012)Latvian
- Vienojas dibināt Visaginas AES projekta kompāniju un starpvaldību darba grupu (September 20, 2012)Latvian
- Visaginas AES - "PAR" vai "PRET"? (September 21, 2012)Latvian
Further information resources
- Atomic Policy in Lithuania
- operator website
- Visaginas NPP on banktrack.org
- Nuclear energy, environment and the public sphere
- Status of proposed nuclear plants in the Baltic Sea region as of August 29, 2012[9]:
- Visaginas NPP:
- proposed construction start: 2016
- proposed operation begin: 2020
- Visaginas NPP:
- ↑ National Report On the implementation of the obligations under the Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, 3rd Review meeting of the Contracting Parties, the Republic of Latvia. The Radiation Safety Centre of the Republic of Latvia 2008.
- ↑ http://en.wikipedia.org/w/index.php?title=Visaginas&oldid=445363068 as at October 15, 2011
- ↑ 3.0 3.1 3.2 3.3 3.4 http://en.wikipedia.org/w/index.php?title=Visaginas_Nuclear_Power_Plant&oldid=447180300 as at October 15, 2011
- ↑ 4.0 4.1 http://en.wikipedia.org/w/index.php?title=Ignalina_Nuclear_Power_Plant&oldid=451980296 as at October 15, 2011
- ↑ 5.0 5.1 5.2 http://www.nuklearforum.ch/ebarticle.php?art_id=de-131842098266&id=de-116487550462--p-1 as at October 15, 2011
- ↑ http://www.diena.lv/bizness/finanses/visaginas-aes-buvnieciba-sadardzinas-13953556.
- ↑ http://www.gyva.lt/articles/view/279
- ↑ 8.0 8.1 8.2 8.3 For protection against automatical email address robots searching for addresses to send spam to them this email address has been made unreadable for them. To get a correct mail address you have to displace "AT" by the @-symbol.
- ↑ composition by Bernd Ebeling, http://contratom.de as at August 29, 2012
source: World Nuclear Industrial Status Report 2012, Schneider, M. et al.; Nuclear Power Reactors in the World, IAEA, Vienna, 2008